HomeAbout UsMMG ServicesQualitySafetyHuman ResourceCPDMedia CenterContact Us

Technical Services Division is one of the prime departments of the MMG that has been providing technical construction services to the industry since the 1950’s. However the division was formally set up as a separate entity in late 90s to meet the requirements of the local industrial manufacturers and started serving direct clients in the field of specialized services. In 2005 Technical Service Division entered into the field of maintenance and since then has successfully completed several maintenance and T/A jobs for Saudi Aramco, SABIC, Saudi Chevron and others. In the past three years the Technical Services Division has successfully completed projects worth SR75 million.

Services
The division provides services in the area of Engineering, Plant Shut down and Maintenance, Scafolding, Specialized Services, Plant Modification and Revamping and Electrical, Instrumentation and Control System.

In Engineering, the Technical Services Division collaborates with Jedson of the United States. In specialized Services, the division collaborates with Dutch company, Lion and render services in the area of chemical cleaning, oil flushing, cold cutting, bolt torque and tensioning, pressure testing and pipeline scrapping.

Under Maintenance the division undertakes complete project management, static equipment maintenance, rotary equipment management, structural piping and all fabrication work and hydro-jetting services.

In Electrical, Instrumentation and Control System, Technical Services Division in collaboration with Pakistan’s UEC specializes in revamping of the projects, control system installation, local instruments and panel, instrument cabling and wiring fire and gas detection system, grounding and lightning system, optimized material selection and testing and Commissioning.

To achieve the corporate vision, the Technical Services Division has set its own vision and mission:

Vision
To be the Client preference in performing all Industrial Technical Support and Maintenance Activities by providing Integrated Solutions and Services.

Mission

To deliver an ultimate quality service with extensive consideration on HSE (Health, Safety & Environment) requirements.

Quality

MMG is a ISO 9001: 2008 certified group. In addition it possesses  several ASME certifications that include  ASME “P” for fabrication and assembly of pressure piping; ASME “U” for manufacture of pressure vessels; ASME “S” for manufacture and assembly of power boilers; ASME “A” for assembly of power boilers; and ASME “R” for Repair and Alterations of pressure vessels and boilers.


Completed and on-going projects

Shut-down and Maintenance

S.No

Client / Project

Work Description

Period

Location

01

Saudi Aramco Qatif GOSP, PO: 6510431698

Repair chiller – Nozzle Replacement – Q05-D-392

On-Going June 2010

Qatif

02

Saudi Aramco Ras Tanura Refinery,
PO:  6510428878

General Services  - Plant J06 & J72

To Start July 2010

Rastanura

03

Saudi Aramco, Ras Tanura Refinery.
PO :  6510398537

Manpower Support , Heater Tubes Replacement

Nov ‘09 to Jan‘10

Rastanura

04

Saudi Aramco, Riyadh Refinery. PO : 6600020778

50” Falre Header Replacement  (T&I 2009)

Dec ‘08 to Jun ‘09

Riyadh

05

Saudi Arabian Fertilizer Co. (SAFCO) / UHDE Arabia Ltd. PO : 5475

CO2 Condensate Pump - Piping installation  & Tie-in works

Sep ‘08 to Oct ’08

Jubail

06

Saudi Aramco – Hawiyah & Haradh Gas Plant  . PO : 6510279427

Revalidation of Gas Well Flow Lines (31 Headers)

Nov ‘07 to Feb ’08

Hawiyah & Haradh

07

Saudi Arabian Fertilizers Co.  (SAFCO) / UHDE Arabia Ltd. PO : 95-3036-IK-005

SAFCO IV T&I – Deficiency Rectification work

Jan ‘08 to Feb ’08

Jubail

08

Saudi Aramco, Riyadh Refinery. PO : 6510227988

Tubes Replacement of Platformate Heater 301 H1/H2/H3 (T&I 2007)

Jan ‘07 to Feb ‘07

Riyadh

09

Saudi Aramco, Riyahd Refinery / Technip
PO : SPO – 297

Pump Vibration  - Suction Piping  Welding and Alignment Correction

Feb ’07

Riyadh

10

Saudi Chevron Phillips (SCP) PO : ACP-1957-EXP

Modification of Column internal and Tray repair
C1600, C1610, C1700 & C 1720

Nov ‘06 to Mar 07

Jubail

11

Saudi Aramco – Shedgum Gas Plant / A.R. Al-Bader Est.
PO : 11971

Post Weld Heat Treatment – Pipe Welds

July ’07

Shedgum / Abqaiq

12

Saudi Aramco – Shedgum GOSP 5. PO : 6510207236

48” Flare Stack Repair
(Cold Cutting & Welding)

Sep ’06

Shedgum / Abqaiq

Chemical Cleaning

Sl. No.

Client / Project

Work Description

Period

Location

1

Saudi Aramco – Safania Off-Shore

Chemical Cleaning of Gas Cooler – E101

June 2010

MMG TSD Workshop - Dammam

2

Saudi Aramco – Abqaiq Gas Plant

Chemical Cleaning of  Glycol De-Hydration Unit

April 10 to May 2010

Abqaia

3

Eastern Petrochemicals Company (SHARQ) / Foster Wheeler [PO# 6CF02-SC15/00]

Off Plot Pipeline Scraping & Chemical cleaning

Sep 08 to Apr 09

Jubail

4

Saudi Aramco – Juaymah Gas Plant Expansion Project / Tecnicas Reuindas (TRG) [PO # 6CT01-SC14/00]

Chemical Cleaning of  ADIP, Refrigeration, Lube Oil and BFW systems & N2 Padding

Sep 08 to March 09

Juaymah

5

Petro Rabigh / Mitsui Engineering & Ship Building Company Ltd [MESAR] [PO # MMG08-RAB-DC63/00]

Chemical Cleaning  of O2, CO2 and EO Reactor Systems & N2 Padding

May 08 to Dec 08

Rabigh

6

Eastern Petrochemicals Company (SHARQ) / Samsung Engineering & Const. Co., [PO # PO-S-PC-002]

Passivation of Cooling Water System

Jan 08 to March 09

Jubail

7

Jubail Chevron Philips (JCP) [PO #JCP-0241]

Boil out / Degreasing of Boilers V-7650, V-7645 & V-7640

2007/2008

Jubail

8

Saudi Aramco, Safaniya [PO # 6510278840]

Chemical Cleaning of Heat Exchanger E-201 A/B

November 07

MMG TSD Workshop- Dammam

9

Saudi Chevron Philips (SCP) [PO #4502792584]

Decontamination of Columns, Vessels & Drums [C-1720, C-1700 E-1720A/B/C, & D-1720]

October 07

Jubail

10

Saudi Chevron Philips (SCP) [PO #SCP-1957-EXP]

Decontamination of Columns, Vessels & Drums [C-1720, D-1720 E-1720A/B,  C-1710,  E-1700, C-1600, E-1610, E-1606, D-1610 & C-1220]

January 07

Jubail

11

Jubail United Petrochemical Company / Linde Arabian Co. Ltd., (LAO) [PO # R6P001-001]

Passivation of Cooling Water Pipelines

July 06

Jubail

12

Saudi Aramco, Safaniya [PO # 6510183263]

Chemical Cleaning of Gas Cooler (Tube side)  4-E-301

April 06

MMG TSD Worshop - Dammam

13

Jubail United Petrochemical Co., (JUPC) / Toyo Engineering Saudi Arabia Ltd.,  (SATEC) EO/EG Project [PO # 4CT01-SC-26/00]

Chemical Cleaning of O2 & N2 Pipelines and Nitrogen Padding

February 06

Jubail

Pipeline Scrapping

Sl. No.

Client / Project

Work Description

Period

Location

1

Eastern Petrochemicals Company (SHARQ) / Foster Wheeler  - U&O

U&O Pipeline Flushing & Air blow work

July 09 to Sep 09

Jubail

2

Eastern Petrochemicals Company (SHARQ) / Foster Wheeler – OFF PLOT       [PO# 6CF02-SC15/00]

Off Plot Pipeline Scraping & Chemical cleaning

Sep 08 to Apr 09

Jubail

3

Saudi Aramco – Hawiyah & Haradh Gas Plant [PO # 6510279427]

Revalidation of  Gas Well Flow Lines

Nov 07 to Feb 08

Hawiyah & Haradh

4

Jubail Chevron Philips (JCP) [PO # JCP-0124]

Dewatering, Scraper Cleaning, Drying and Preservation (16 KM Long pipelines)

Aug 06

Jubail

Oil Flushing

Sl. No.

Client / Project

Work Description

Period

Location

1

Saudi Aramco – Abqaiq Gas Plant / Fouad Abdulla Fouad Co. Ltd.,  [PO # 13044 CM]

Lube Oil Flushing of  Compressor Lube oil lines

Jun 07 to Aug 07

Abqaiq

2

Saudi Aramco, GOSP - Qatif / Arabian CBI [PO # 128150 & POF-8101 & 4FC01-PR-02]

Chemical Cleaning and Oil Flushing of Pump LO piping

June 04 to Jan 05

Qatif

Hydraulic Bolt Torque & Tensioning

Sl. No.

Client / Project

Work Description

Period

Location

1

Saudi Aramco – Hawiyah NGL . PO:6510423640, 6510423456, 6510422487

Bolting Services (Torque)

Arp 10 – Aug 10
(on-Going)

Hawiyah

2

Saudi Aramco – UGP. PO: 6510418609

Bolting Services (Torque)

May 10

Uthmaniyah

3

SASREF- Balance of Plant / CB&I Lummus [po # 7CL02-SC40/00]

Bolting Services (Torque and Tensioning)

From Aug 09

Jubail

4

SABIC- Saudi Kayan – Package K-022 & K-024 / Flour Arabia [PO # 7CS04-SC28/00]

Bolting Services (Torquing and Tensioning)

From March 09

Jubail

5

Saudi Aramco – Khurais KCC Project (GOSP-3 & 4) / SAIPEM PO # 8CS02/SC15/00]

Bolting Services (Torquing and Tensioning)

March 09 to July 09

Khurais

6

Jesco Seamless Pipe Plant Project / Danieli [PO # 8CJ03-SC08/00]

Bolt Torquing and Tensioning

Dec 08 to August 09

Jubail

7

SABIC - Yanbu National Petrochemicals Company (Yansab - EG-1 Project) / Saudi Toyo Engineering Co., [PO # P-135 & 278]

Bolt Torquing and Tensioning

Sep. 08 to Jan. 09

Yanbu

8

Saudi Aramco – Juaymah Gas Plant Project / Technicas Reundas  [PO # 6CT01-SC18/00]

Bolt Torquing & Tensioning

Sept. 07 to July 09

Juaymah

9

Saudi Aramco – Water Injection Pump Station (WIPS) Facilities Project / SAIPEM [PO # 7CS02/SC18/00]

Bolt Torquing & Tensioning

Sept. 07 to July 09

Ain Dar, Uthmaniyah, Hawiyah & Haradh

10

Saudi Chevron Philips / Jubail Chevron Philips Project / Parson [PO # 834/010193-010130]

Bolt Tensioning

Oct. 07

Jubail

11

SABIC - Yanbu National Petrochemicals Company (Yansab - EG-1 Project) / Saudi Toyo Engineering Co.,

Anchor Bolt Tensioning

Oct. 07

Yanbu

12

TASNEE Project

Bolting Services

Aug.07

Jubail

13

Jubail United Olefins Complex, JUEG-EO/EG Project, /  Saudi TOYO Engineering Co.,

Bolting Services

May 06 to June 2007

Jubail

Cold Cutting

Sl. No.

Client / Project

Work Description

Period

Location

1

Saudi Aramco , Uthmaniyah GOSP 4
PO# 6510431356

Modification of 12” & 16” welded body valves – Cold Cutting and Welding

June 10

Uthmaniyah

2

Saudi Aramco, Riyadh Refinery [PO # 6600020778]

50” Flare Line Replacement

Dec 08 to June 09

Riyadh

3

Saudi Aramco – Shedgum GOSP-5 [PO # 6510207236]

Repair of  48” Flare Stack (Cold cutting and Welding)

Sep 06

Shedgum / Abqaiq

4

Saudi Aramco – Berry Gas Plant / Technip [PO # 2124/POF/806-R18]

Cold Cutting work at Unit at  A475 SRU 100 (Qatif Facilities)

July 05

Jubail

5

Saudi Aramco – Berry Gas Plant / Technip [PO # 2124/POF/806-R17]

Cold Cutting work at Unit at  A475 SRU 200 (Qatif Facilities)

March 05

Jubail

Pressure Testing

Sl. No.

Client / Project

Work Description

Period

Location

1

Saudi Aramco – Hawiyah & Haradh Gas Plant [PO  # 6510279427]

Revalidation of  Gas Well Flow Lines

Nov 07 to Feb 08

Hawiyah & Haradh