Selected Projects

S.N Client / Project Work Description Period Location
81 Saudi Arabian Mining Co/ WP - Civil
MH1 CN:09-5180-PH-181
MH1-Substation Building Works Apr. 10 to Dec. 10 Ras Al Khair
82 Saudi Arabian Mining Co/ WP - Civil
MH1 CN:10-5267-PH-268
MH1/MH2/MH3 - Assembly / Erection
of Fixed Mobile Conveyors and
Associated SMEI & Civil Works
Jun. 10 to Dec. 10 Ras Al Khair
83 Saudi Aramco/Hyundai - KARAN
Gas Processing CN:HDEC-WEJU-09-237
Erection of Structural Steel &
Painting Works
Feb. 10 to Dec. 11 Khursaniyah
84 Saudi Chevron Phillips (SCP)
WP - CN: NCP-8013
Corridor Works Associated with
Aramco Metering Facilities 
Mechanical Works 
May. 10 to Jun. 11 Jubail
85 Saudi Chevron Phillips (SCP)
WP - CN: NCP-8021
SCP Lab Expansion Project
Civil, Structural, Architectural,
Plumbing & Utility System Works
Apr.10 to Dec. 10 Jubail
86 Saudi Chevron Phillips (SCP)
WP - CN: NCP-8010
Greenfield Mechanical Works  Civil,
Mechanical, E & I Erection, Piping
Fabrication & Erection and Hydrotest 
(Area 58 – Air Supply System)
May. 09 to Aug. 10 Jubail
87 Saudi Chevron Phillips (SCP)/JGC
Arabia - CN: 4848-3100-004
General Construction Works
(CSB, HVAC, Mechanical, E & I, Painting,
Insulation, Testing, and Comm. Assistance)
Apr. 09 to Apr. 11 Jubail
88 Saudi Chevron Phillips (SCP)/JGC
Arabia  - CN: 4848-3120-001
Early Civil Works Site Development,
Grading, Foundation & Pre-casting)
Jan. 09 to Oct. 09 Jubail
89 Saudi Chevron Phillips (SCP) /
Daleim SA  - CN: NCP-C-005A
Mechanical Works (Structural Fabrication &
Erection, Equipment Erection, A/G & U/G
Piping, Painting, and Commissioning Assistance)
Nov. 08 to Mar. 09 Jubail
90 Saudi Chevron Phillips (SCP)/
Daleim SA  - CN: NCP-C-004A
Building & HVAC Works Oct. 08 to Dec. 09 Jubail
91 Saudi Aramco/Saudi Arabian Saipem -
KCC CN#SAS/PROC/405/2008
ISBL Piping Miscellaneous &
Structural Erection Works
Aug. 08 to ar. 09 Khurais
92 Saudi Aramco/Saudi Arabian
Saipem - KUC
CN#SAS/PROC/395/2008
Piping Fabrication Works Jul. 08 to Oct. 08 Dammam
93 Saudi Aramco/Saudi Arabian
Saipem - KUC
CN#SAS/PROC/399/2008
Liquid Coating of Pipes Jul. 08 to Oct. 08 Dammam
94 Saudi Arabian Mining Co/Samsung
SA - Ammonia Plant CN:SC-2158
General Construction Works
(Piling, Waste Water/Ammonia Tanks Foundations,
Major Civil Works, Steel Structure, Equipment Erection,
A/G & U/G Piping, E & I Works include Main Substation,
Control & Emergency Generator Buildings, Fence & Gate,
Road & Paving, Drainage, Grounding, Cathodic Protection,
Cable Tray, Transformer, Switchgear, Panel, UPS, Cabling,
Lighting, Communication, DCS & SAT Installation, and
All Associated Works
Dec. 07 to Jun. 10 Ras Al Khair
95 Saudi Aramco Shell Refinery/CB & I
Lummus - ULSD CN#04262-2505 & 2535
Site Preparation & Turnaround Works Oct. 07 to May. 08 Jubail
96 Saudi Aramco/JV SNC Lavalin & saudi
Arabian Saipem - WIPS
CN:084255-000-SC-5900-008
Field Electrical, Instrumentation, Communication
Installations for 69 kV and HV/LV Substation
Apr. 07 to Jun. 09 Uthmaniyah
97 Saudi Aramco/JV SNC Lavalin & saudi
Arabian Saipem - WIPS
CN:084255-000-SC-5900-004
Mechanical & Piping Works Jan. 07 to Jun. 09 Uthmaniyah
98 National Industrialization Co (TASNEE)/Flour
Arabia - PE CN:A3GP-40-K001
Architectural, Civil, Structural, Mechanical,
Electrical & Instrumentation Works
Jun. 07 to Jun. 09 Jubail
99 Eastern Petrochemical Co (SHARQ) /
Linde Arabian Contractors Ltd - 3rd
Exp CN:052-2MD040
Mechanical Works (Structural, Equipment
Installation, A/G Piping, Painting, Insulation,
Scaffolding Provision, Material Handling,
Pre-Commissioning, Commissioning Assistance,
and Temporary Facilities
Oct. 0 to Dec. 07 Jubail
100 Eastern Petrochemical Co (SHARQ) /
Samsung SA - 3rd Expn. CN:SC-2066
Civil, Architecture, Structural, Mechanical,
Piping, E & I, Painting, Chemical Cleaning,
Flushing, Blowing, Pre-commissioning, and
Reinstatement Works
Mar. 06 to Feb. 08 Jubail